Situation: The original swimming pool at this casino resort had experienced extreme soil settlement to the point that the pool crack open and drained all the water out. The...
Situation: A Contractor installed 70’deep by 6’diameter caissons for a freeway overpass. Testing revealed anomalies and voids at the 15’ and 70 depths. The...
Situation: Imagine Schools, a charter school with locations throughout the United States, received funding to construct a brand new MS/HS next to their existing Elementary...
Situation: The footprint of this new structure was too close to an existing retaining wall to allow for excavation of the footing to the required depth without compromising...
Situation: The plans called for caissons to carry the column loads for a new balcony addition. The steel cages had been delivered to the job site but when the drill rig arrived...
Situation: The original problems consisted of both soil settlement and water leaking in the underground tunnels from the garage to the office building. The discovery indicated...
Situation: Portions of the concrete slab had settled up to 2 inches. This did create a trip hazard at the slab joint, but the more serious issue was the stress it was putting...
Project Scope: The addition of a new conveyor system on a mezzanine above existing conveyors was needed to handle their expanding business.
The Challenge: Installing...
Situation: The 23 story concrete shear wall residential building had 35 spandrel beams that were cored for pipe sleeves below the approved zone per criteria given by the engineer...
Situation: SubZero, a manufacturer of kitchen appliances, recently purchased an empty 400,000 SF warehouse on the West side of the Phoenix Valley. SubZero upgraded the interior...