Situation: A total of 25 existing guy wire anchors needed to be replaced due to breaking from corrosion. The new...
Situation: A total of 25 existing guy wire anchors needed to be replaced due to breaking from corrosion. The new...
Situation: The original swimming pool at this casino resort had experienced extreme soil settlement to the point that the pool...
Situation: A Contractor installed 70’deep by 6’diameter caissons for a freeway overpass. Testing revealed anomalies and voids at the 15’...
Situation: The footprint of this new structure was too close to an existing retaining wall to allow for excavation of...
Situation: Existing subsurface soil conditions facilitated the foundation movement of the existing residence. Previous grouting and subsurface rocks made driving...
Situation: The plans called for caissons to carry the column loads for a new balcony addition. The steel cages had...
Situation: The original problems consisted of both soil settlement and water leaking in the underground tunnels from the garage to...
Situation: Imagine Schools, a charter school with locations throughout the United States, received funding to construct a brand new MS/HS...
Situation: Portions of the concrete slab had settled up to 2 inches. This did create a trip hazard at the...
Situation: Marriott wanted to save and restore the adobe lodge building, which was built in the 1930s, back to its...
Situation: West Sixth, on the corner of Mill and 6th avenue in downtown Tempe had sat unoccupied and only 80%...
Situation: On this renovation project ten 6" Pre-cast hollow-core floor planks had numerous penetrations through them for utilities. Many of...